Entering overhead and profit rates for bid items
Entering overhead and profit rates for cost types
Including bonding costs in 9-5 Takeoffs
About overhead and profit rates
Note: This functionality is available only if you have the Estimating Module.
You can choose from three different methods to set up the overhead and profit rates:
- Assign different overhead and profit rates by bid item.
- Assign overhead and profit rates by cost types.
- Assign overhead and profit rates by typing the overhead and profit rate values in the appropriate grid cells.
Note: Sage 100 Contractor only calculates overhead and profit for each item that has an overhead or profit rate in the grid.